A little bit of drywall was installed:
Yesterday the contractor alerted me that some of my floor joists were not in good condition. A piece of plywood was screwed and glued to the floor over the warped joists. I'm worried about this... I thought the message I got this morning was that the joists would be repaired for some added cost. They have not been repaired, but the plywood has been installed. If you step on the portion shown in the upper right hand corner it is quite bouncy and not level:
The new bathtub was positioned in the bathroom:
And the bonus project! I had the contractor remove the white louvered wall that served as a divider between the kitchen and the living room. This shows progress of the new knee wall being constructed to replace it. It's almost there:
No comments:
Post a Comment