Thursday, May 8, 2008

Day 3

Some more progress on day 3.

Some plumbing work was completed:
The workers shown here completed more work on the floor, ceiling, and walls:



Wednesday, May 7, 2008

Day 2

Day 2 was not nearly as dramatic as day 1., but overall I was pleased with the progress.

A little bit of drywall was installed:


Yesterday the contractor alerted me that some of my floor joists were not in good condition. A piece of plywood was screwed and glued to the floor over the warped joists. I'm worried about this... I thought the message I got this morning was that the joists would be repaired for some added cost. They have not been repaired, but the plywood has been installed. If you step on the portion shown in the upper right hand corner it is quite bouncy and not level:

The new bathtub was positioned in the bathroom:
And the bonus project! I had the contractor remove the white louvered wall that served as a divider between the kitchen and the living room. This shows progress of the new knee wall being constructed to replace it. It's almost there:

Monday, May 5, 2008

End of Day 1

I checked in after work and was surprised to see how much had been done.

The walls and ceiling:

The pipes where the vanity used to be:

The quarantine bubble between the construction and my living room:


The scary thing is that I got a phone call from the contractor this evening. He wants to meet me first thing in the morning. Apparently there's something unexpected with the floor. I'm seeing dollar signs, and is this an ulcer I feel forming? (How fast excitement can turn into stress...)

Pre Remodel Chaos

My contractor should be here in a few minutes. Here's what my apartment looks like.

The living room is more crowded than it has ever been. The bathroom and my closet are completely emptied of my belongings:

Monday, April 28, 2008

Finishing Touches


This weekend I spent some time on the finishing touches for my new bathroom. I bought some towels and framed some art. Now if only I could jump forward in time and see everything installed...

Construction begins one week from today!

Friday, April 25, 2008

Almost there!

It's really amazing. I almost have nothing left to do and I still have one work week and two weekends before the contractor starts work. The most recent development was today. I just picked up my floor tile and I like it even more than I imagined.

Here's a photo of the floor tile with a few tiles of the shower tile, the vanity door, and the sink faucet. I like the way everything looks together!


(Alana in Canada... I may end up putting white contact paper on the inside of the frosted glass if I find that it looks too messy.)

Summary of this week's accomplishments:
  • Floor tile arrived
  • Matching towel bars, TP holder, and glass shelf ordered
  • Toothbrush holder purchased
  • Saw my contractor featured on television news (a feature on green design)! Good thing I've already got a date set for my job!

Monday, April 21, 2008

Tile Choices

I've been asked what tile I ended up choosing for my floor. I wasn't able to get the Eco-Gres Mosaic tile that I wanted because the manufacturer was out of stock. I found a replacement by Daltile. Here's a simulation I created on their website:

This looks NOTHING like my bathroom, but the floor tile and wall tile shown here represent what I have ordered (with the exception of the trim between the floor and the wall, I'm not using what is shown here and I couldn't seem to make it go away).

This is the Daltile Colorbody Porcelain, in their Keystone line. The color is Suede Gray and the tiles will be 2" square.